Projects by Industry

Pulp and Paper

  • Gold River pulp and paper mill – demolished the paper machine and Thermal Mechanical Pulping building to below grade; cleared, catalogued and crated equipment; recycled steel, cladding and concrete slabs.
  • Elk Falls (Catalyst Paper) – Retrofitting of roof purlins on number 1 and 2 paper machine buildings.
  • Howe Sound Pulp and Paper Peroxide Press installation
  • Realigned crane rails on gantry crane in the paper warehouse.
  • Port Alice pulp mill – Wash Press installation
  • NorskeCanada (Port Alberni) – Relocation and upgrade of demineralizer plant.


Mining

  • Western Canadian Coal’s Wolverine Mine – Built all structural and mechanical systems for the mine site, from crusher hopper to train loading.
  • Pine Valley Mine – Erected building and wash prep plant, including structural steel for the building, mechanical components and tanks.

Petro-Chemical and Industrial Gases

  • Air Liquide – Upgrade oxygen plant.
Material Handling
  • Saskatchewan Wheat Pool – demolished entire dust collection system to prepare for installation of new system, within a short shut-down.
  • Saskatchewan Wheat Pool – full-service project management for replacement of bag house, including scheduling and subcontractors.
  • Westshore Terminals – upgrades to coal handling system.
Power Generation
  • BC Hydro – upgrades to an off-shore water-intake platform: required temporary support of structure, deconstructing it piece by piece and reinstallation of structural steel work.
  • BC Hydro’s John Hart Dam – project management and completion of spill-gate refurbishment, including design, supply, installation and environmental protection plan.